What house demolition includes
House demolition means taking the whole building apart and off the lot: roof, walls, floors, chimney and, in most cases, the foundation. Our quote lists each of these so you know what is in the price.
- The structureRoof, framing, masonry, chimney, porches and attached decks.
- The foundationBasement walls, slab and footers removed, or cut below grade if you prefer.
- HaulingDebris loaded and taken to a licensed facility, with concrete and metal sorted out.
- Backfill and gradingThe hole filled, compacted in lifts and graded to drain.
How a house comes down
Permit and notices
Demolition permit filed, and Ohio EPA notice where the building is covered.
Shutoffs confirmed
Gas, electric, water and sewer disconnected by each provider.
Tear-down
The excavator takes the house apart from the top, away from neighbors and wires.
Sort and haul
Wood, masonry and metal separated and trucked off.
Foundation and fill
Basement and footers out, hole backfilled and the lot graded.
What affects the price of house demolition?
We price this after we see it, because access and what is underneath change the job more than square footage does. These are the things that move the number.
- Square footage and number of stories
- Basement, crawl space or slab
- Brick or stone versus frame
- Distance to neighbors, wires and the street
- Septic tank or well on the lot
- Contents left inside the house
- Finish grade: rough, topsoil or seeded
Signs a house is past repairing
These are the conditions we see most often on houses that end up coming down:
- Foundation walls bowed or broken
- Roof open and floors rotted through
- Fire damage into the framing
- Long vacancy with water in the basement
- A structure condemned or ordered removed
Does a house in Medina need an Ohio EPA notice?
Ohio EPA's asbestos rules decide whether paperwork comes before the excavator. Under Ohio Administrative Code 3745-20-01, a residential building with four or fewer dwelling units is not a regulated facility, so a single house or its garage normally needs no state notification. Commercial buildings, larger apartment buildings and homes that were ever used as a business are covered.
For a covered building, rule 3745-20-03 requires written notice to Ohio EPA at least ten working days before demolition starts, and the Ohio EPA asbestos program wants an inspection for asbestos first. We check the building's history with you, because a house that once held a shop or office is treated differently.
Before a house comes down
What we need from you
- The address and parcel, and whether it is inside the city or a township
- Whether anyone still lives there and what has been cleared out
- What is on the lot that stays: trees, garage, driveway, fence
- Whether you plan to rebuild, and roughly where
- Any letters from the city, township or your insurer about the building
House Demolition questions
Is it cheaper to demolish a house or renovate it?
Can part of a house be demolished and the rest kept?
Do you demolish mobile homes?
What do I do about my mortgage or insurance before demolition?
Get a house demolition quote in Medina
Send your name and phone number, then the address and what needs to come down. We'll call you back to talk it through and set a time to look at it.